Current Projects
![]() |
![]() |
![]() |
Route 117 Bridge | Granville Road Bridge | Elm St Bridge Replacement |
Project | Scope of Work |
Johnson Street Bridge Replacement over MBTA - Peabody, MA $1,566,723 |
Bridges (2) demolition and reconstruction over MBTA railroad, temporary pedestrian bridge, steel sheeting with box beam deck. |
Route 117 Bridge Replacement over the Sudbury River - Concord/Lincoln, MA $6,426,428 |
Temporary bridge and roadway construction, cofferdams, demolition of existing bridge, construction of new bridge - historical granite replication, cast in place 2 span arch structure on pipe piles |
Granville Road Bridge Replacement over the Little River Westfield, MA $2,777,586 |
Bridge demolition and replacement, cofferdams, caisson foundation, precast arch structure (3 span) with precast spandrel walls and precast approach walls. |
Elm Street Bridge Replacement over Amtrak Mansfield, MA $2,347,816 |
Bridge demolition and replacement, caisson foundation with structural steel beams and concrete deck, over MBTA "Acela" Line. |
Box Culvert Replacement-Labor Only under AMTRAK Commuter Rail Winchester, MA $125,000 |
Emergency track shutdown. 24 hour per day work shift for one weekend- Track reinstallation for Monday commuter lines. |
Route 100 over Manhan River South Hampton, MA $1,476,979 |
Two phase bridge DEMO/RECON. Steel sheeting support system, 36" Caisson Foundation w/Precast Bulb Tee Beams and cast in place bridge deck. |