Project Scope of Work
Bullards Crossing Road Bridge Demolition
Hinsdale, MA
$122,255 

Bridge demolition over CSX railroad and site restoration.
Replacement of Culvert at Point Grove Road over Congamond Lake
Southwick, MA
$786,174

Box culvert (14' X 12') removal and replacement, pond dredging, water main and drainage improvements

Bridge Joint Repairs At Various Locations
District 5, MA
$1,335,979 

Removal of existing bridge joints and replace with asphaltic plug joints, along with substructure rehabilitation.
River Street Bridge Replacement over the Concord River
Billerica, MA
$2,346,163

Bridge demolition/reconstruction with concrete and steel pile foundation, structural steel, superstructure with cast in place deck, extensive water and sewer construction.
Replacement of Concrete Median Barrier on a Section of Route 2
Lexington/Lincoln, MA
$1,582,640

Removal and replacement of 11,000 linear feet of concrete barrier with tall wall barrier.
South Ferry Road and Meadow Brook Road Bridge Replacements over the Sawmill River
Montague, MA

$1,290,981 

Removal and replacement of two bridges, H-pile foundation cofferdams, tremie seal cast-in-place bridge decks.
Hovey Road Bridge Replacement over Conrail
Monson, MA

$1,297,432 

Temporary bridge removal, salvage bridge reconstruction roadway reconstruction.
Holland Road Bridge Deck Rehabilitation over the Quinnebaug River and Champeaux Rd Bridge Pier Rehabilitation over Long Pond
Sturbridge, MA
$126,644

Bridge deck rehabilitation and timber pier replacement.
High Street Bridge Replacement over Bay Colony Railroad
Taunton, MA
$1,096,564

Bridge demolition and reconstruction, 48" caissons/piers, H-pile foundation.
Crane Avenue Bridge Replacement over the Three Mile River
Norton, MA
$767,832

Bridge demolition, precast concrete arch bridge, steel sheeted scour walls left-in-place, concrete retaining walls.
North Main Street Bridge Replacement over the Hockanum River
Manchester, CT

$1,884,500

Temporary vehicular bridge, bridge demolition and reconstruction with concrete arch, steel sheeted cofferdams, contaminated soil disposal, water and sewer reconstruction.
Bridge Deck Repairs and Joint Modifications on I-290
Auburn, MA
$2,537,087

Bridge decks (2) partial removal/replacement, cold plane and paving, drainage structure repairs, traffic control, asphalt plug joints.
Deck Repairs and Paving, Bourne and Sagamore Bridges
Bourne, MA
$3,427,459

Bridge repairs, armor joint replacement, membrane waterproof, paving, traffic control, electrical lighting.
Valley Road Bridge Replacement over Whetstone Brook
Killingly, CT
$902,038

Bridge demolition and reconstruction, steel sheeted cofferdams, H-Pile foundation, roadway reconstruction - two phases.
Route 163 Bridge Replacement over the Oxoboxo River
Montville, CT
$1,120,933

Bridge demolition and reconstruction, cofferdams, steel sheeting, control of water, box culverts, bridge structure = triple 10' x 8'.
Murphy Road Bridge Replacement over Susquetonscut Brook
Franklin, CT
$886,565

Bridge demolition and reconstruction, steel sheeted cofferdams, H-pile foundation, roadway reconstruction.
Ingell Street Bridge Replacement over Mill River
Taunton, MA
$992,079

Temporary vehicular bridge and bridge demolition / replacement, steel H-pile foundation, cofferdams, control of water.
Route 12 Bridge Replacement at Whetstone Brook
Killingly, CT
$1,227,890
Temporary vehicular bridge and bridge demolition/replacement with precast arch bridge on caissons, steel sheeted cofferdams and control of water.

Route 3 Reconstruction @ Route 62 Off-ramp
Bedford, MA
$263,000

Highway ramp retaining wall, concrete and rebar only.
West Center Street Bridge Replacement over the Quinnipiac River
Southington, CT
$1,111,000

Bridge demolition and reconstruction with H-pile foundation and box beam deck, water, sewer and drain relocation.
Ellis Pond Dam Reconstruction
Norwood, MA

$747,088
Dam reconstruction within steel sheeted cofferdam, concrete spillway & overflow. Demolish and reconstruct control of dam flows.

Bridge Replacement - Boylston Street,
Over the B&M Railroad Lowell, MA

$ 1,146,397

Bridge demo/recon over railroad, steel sheeting, rock drilled steel piles, concrete work, road reconstruction.
Bridge Replacement - Route 202 (Elm St), Over Otter River
Templeton, MA
$1,067,637

Bridge demo/recon (two phase) maintaining traffic, drilled steel piles, support of excavation concrete work and road, utility recon.
Bridge Replacement - Dedham Street, Over Neponset River
Canton - Norwood - Westwood, MA
$887,813

Bridge demo/recon (two phase) maintaining traffic, steel H-piles support of excavation, concrete work and road recon.
Bridge Replacement Including Signals-South Street, Over B&M Railroad
Ware, MA
$1,237,375

Bridge demo/recon (two phase) maintaining traffic, rocksocket caissons, support of excavation, concrete work and road/utility recon.
Rehabilitation of Bridge Drainage Systems Along I-290 
Millbury/Worcester, MA
$ 107,200

Bridge drainage repairs and maintenance work.
Bridge Replacement - Route 128
Over MBTA Gloucester, MA
$ 777,767

Bridge deck demo/recon (three phase), maintaining traffic, roadway recon.
Bridge Replacement - Wendell Depot
Over the Miller River Orange/Wendell, MA
$2,130,000
Bridge Demo/Reconstruction
48" Caissons Foundation,  Control of Water
Steel Sheeting and H-Piles, concrete and structural steel work, roadway recon

Building Reconstruction
155 River St.
Andover, MA

$583,366

Steel sheeted cofferdam 40 foot deep inside building, tiebacks, two level whale system.  Concrete (1200cy), rebar (120 ton), waterproofing (900 sy).
Seawall Rehabilitation
Oceanside Drive
Situate, MA
$1,137,565
Ocean revetment reconstruction (1200 lf). Concrete seawall removal, rehabilitation and replacement   (1200 cy). 30" diameter concrete encased outfall reconstruction with pipe pile foundation.   Armor stone (5-8 ton) installation with core stone (3 1/2-5 ton) and bedding stone (6"-18").

Bridge Replacement – Chapin Road Over the Assabet River
Hudson, MA

$844,445

BridgeDemo/Reconstruction 3 Structures, Steel Sheeted Cofferdams, H-Pile Foundation.
Morgan Street
South Hadley, MA
$303, 837
18' Arch culvert demolition and replacement with 10' x 8' precast culvert. Control of existing river flows, water main reconstruction.

Rt 495 Bridge Rehab Various Location
District 3, MA
$1,547,875

Substructure and joint rehabilitation on various bridges along I-495.
Depot Street Bridge Reconstruction
Over Dwight Canal
Chicopee, MA

$1,257,458

Bridge Demo/Reconstruction. Temporary Vehicular Bridge both over canal. steel - sheeted support of excavation, utilities - temporary and permanent.
Prospect Street Bridge Reconstruction
Over Hop Brook
Manchester, CT
$920,610

Bridge demo/reconstruction over hop brook, temporary pedestrian bridge, control of water, sewer and road reconstruction.
Route 38 (Main Street) Bridge Replacement Over the Shawsheen River
Tewksbury, MA

$814,649

Bridge Demo/Reconstruction 2 phases over Shawsheen River, temporary pedestrian bridge, pipe pile foundation.
Cadwell Road Bridge over
Southwest Branch of
Housatonic River Pittsfield, MA
$394,587

Bridge demo, box culvert reconstruction in river, control of water, steel sheeting.
Woodland Road Bridge over Washington Mountain Brook
Lee, MA
$817,450

Bridge construction, excavation, pipe piles, steel cofferdams, control of water, concrete tremie seal, precast box beam bridge, utilities.
Route 1 Bridge over Route 140
Foxboro, MA
$2,400,000

Bridge Demo/Reconstruction, piles and lagging, control of water,  precast retaining walls.
Route 1 over Conrail Bridge Construction
Foxboro, MA
$400,000

Bridge Construction, piles and lagging, precast retaining walls, control of water, temporary bridge with access roadway.
Route 12 Tranmissions Water Mains
Groton, CT
$913,000

Transmission water main with Meter/Valve structure, highway reconstruction. Temporary bridge with access roadway.
Effluent Line Stony Brook Treatment Plant
Norwich, CT
$421,353

6" force main, rock excavation, clearing, access road construction and roadway reconstruction.
Windham Avenue Water Line Extension
Colchester, CT
$61,000

8"&12" water mains, clearing, access road construction, state highway pavement, pavement restoration.
Indian River Flood Relief Project
Norwalk, CT
$520,000

Drainage, Box Culvert, Bridge, Flood Control, Concrete, Cast-In-Place structures.
Byram Road, Indian Field Road Bridges
Over Metro North Greenwich, CT
$50,000

Water main on bridge over metro North Railroad.
Water Street Reconstruction
Norwalk, CT
$500,000

Water, Sewer, Drain, Roadway.
Leadmine Road Bridge Rehabilitation
Sturbridge, MA
$88,756

Bridge deck rehabilitation, bridge rail replacement.
Bridge Replacement - Graniteville Road/ 
River Street Over B&M Railroad Westford, MA
$886,688

Temporary bridge removal and bridge recon, 42" caissons, concrete work, road, utility recon.