Completed Projects
![]() |
![]() |
![]() |
Hovey Road Bridge | Murphy Road Bridge | North Main Street Bridge |
Project | Scope of Work |
Bullards Crossing Road Bridge Demolition Hinsdale, MA $122,255 |
Bridge demolition over CSX railroad and site restoration. |
Replacement of Culvert at Point Grove Road over Congamond Lake Southwick, MA $786,174 |
Box culvert (14' X 12') removal and replacement, pond dredging, water main and drainage improvements |
Bridge Joint Repairs At Various Locations District 5, MA $1,335,979 |
Removal of existing bridge joints and replace with asphaltic plug joints, along with substructure rehabilitation. |
River Street Bridge Replacement over the Concord River Billerica, MA $2,346,163 |
Bridge demolition/reconstruction with concrete and steel pile foundation, structural steel, superstructure with cast in place deck, extensive water and sewer construction. |
Replacement of Concrete Median Barrier on a Section of Route 2 Lexington/Lincoln, MA $1,582,640 |
Removal and replacement of 11,000 linear feet of concrete barrier with tall wall barrier. |
South Ferry Road and Meadow Brook Road Bridge Replacements over the Sawmill River Montague, MA $1,290,981 |
Removal and replacement of two bridges, H-pile foundation cofferdams, tremie seal cast-in-place bridge decks. |
Hovey Road Bridge Replacement over Conrail Monson, MA $1,297,432 |
Temporary bridge removal, salvage bridge reconstruction roadway reconstruction. |
Holland Road Bridge Deck Rehabilitation over the Quinnebaug River and Champeaux Rd Bridge Pier Rehabilitation over Long Pond Sturbridge, MA $126,644 |
Bridge deck rehabilitation and timber pier replacement. |
High Street Bridge Replacement over Bay Colony Railroad Taunton, MA $1,096,564 |
Bridge demolition and reconstruction, 48" caissons/piers, H-pile foundation. |
Crane Avenue Bridge Replacement over the Three Mile River Norton, MA $767,832 |
Bridge demolition, precast concrete arch bridge, steel sheeted scour walls left-in-place, concrete retaining walls. |
North Main Street Bridge Replacement over the Hockanum River Manchester, CT $1,884,500 |
Temporary vehicular bridge, bridge demolition and reconstruction with concrete arch, steel sheeted cofferdams, contaminated soil disposal, water and sewer reconstruction. |
Bridge Deck Repairs and Joint Modifications on I-290 Auburn, MA $2,537,087 |
Bridge decks (2) partial removal/replacement, cold plane and paving, drainage structure repairs, traffic control, asphalt plug joints. |
Deck Repairs and Paving, Bourne and Sagamore Bridges Bourne, MA $3,427,459 |
Bridge repairs, armor joint replacement, membrane waterproof, paving, traffic control, electrical lighting. |
Valley Road Bridge Replacement over Whetstone Brook Killingly, CT $902,038 |
Bridge demolition and reconstruction, steel sheeted cofferdams, H-Pile foundation, roadway reconstruction - two phases. |
Route 163 Bridge Replacement over the Oxoboxo River Montville, CT $1,120,933 |
Bridge demolition and reconstruction, cofferdams, steel sheeting, control of water, box culverts, bridge structure = triple 10' x 8'. |
Murphy Road Bridge Replacement over Susquetonscut Brook Franklin, CT $886,565 |
Bridge demolition and reconstruction, steel sheeted cofferdams, H-pile foundation, roadway reconstruction. |
Ingell Street Bridge Replacement over Mill River Taunton, MA $992,079 |
Temporary vehicular bridge and bridge demolition / replacement, steel H-pile foundation, cofferdams, control of water. |
Route 12 Bridge Replacement at Whetstone Brook Killingly, CT $1,227,890 |
Temporary vehicular bridge and bridge demolition/replacement with precast arch bridge on caissons, steel sheeted cofferdams and control of water. |
Route 3 Reconstruction @ Route 62 Off-ramp Bedford, MA $263,000 |
Highway ramp retaining wall, concrete and rebar only. |
West Center Street Bridge Replacement over the Quinnipiac River Southington, CT $1,111,000 |
Bridge demolition and reconstruction with H-pile foundation and box beam deck, water, sewer and drain relocation. |
Ellis Pond Dam Reconstruction Norwood, MA $747,088 |
Dam reconstruction within steel sheeted cofferdam, concrete spillway & overflow. Demolish and reconstruct control of dam flows. |
Bridge Replacement - Boylston Street, Over the B&M Railroad Lowell, MA $ 1,146,397 |
Bridge demo/recon over railroad, steel sheeting, rock drilled steel piles, concrete work, road reconstruction. |
Bridge Replacement - Route 202 (Elm St), Over Otter River Templeton, MA $1,067,637 |
Bridge demo/recon (two phase) maintaining traffic, drilled steel piles, support of excavation concrete work and road, utility recon. |
Bridge Replacement - Dedham Street, Over Neponset River Canton - Norwood - Westwood, MA $887,813 |
Bridge demo/recon (two phase) maintaining traffic, steel H-piles support of excavation, concrete work and road recon. |
Bridge Replacement Including Signals-South Street, Over B&M Railroad Ware, MA $1,237,375 |
Bridge demo/recon (two phase) maintaining traffic, rocksocket caissons, support of excavation, concrete work and road/utility recon. |
Rehabilitation of Bridge Drainage Systems Along I-290 Millbury/Worcester, MA $ 107,200 |
Bridge drainage repairs and maintenance work. |
Bridge Replacement - Route 128 Over MBTA Gloucester, MA $ 777,767 |
Bridge deck demo/recon (three phase), maintaining traffic, roadway recon. |
Bridge Replacement - Wendell Depot Over the Miller River Orange/Wendell, MA $2,130,000 |
Bridge Demo/Reconstruction 48" Caissons Foundation, Control of Water Steel Sheeting and H-Piles, concrete and structural steel work, roadway recon |
Building Reconstruction 155 River St. Andover, MA $583,366 |
Steel sheeted cofferdam 40 foot deep inside building, tiebacks, two level whale system. Concrete (1200cy), rebar (120 ton), waterproofing (900 sy). |
Seawall Rehabilitation Oceanside Drive Situate, MA $1,137,565 |
Ocean revetment reconstruction (1200 lf). Concrete seawall removal, rehabilitation and replacement (1200 cy). 30" diameter concrete encased outfall reconstruction with pipe pile foundation. Armor stone (5-8 ton) installation with core stone (3 1/2-5 ton) and bedding stone (6"-18"). |
Bridge Replacement – Chapin Road Over the Assabet River Hudson, MA $844,445 |
BridgeDemo/Reconstruction 3 Structures, Steel Sheeted Cofferdams, H-Pile Foundation. |
Morgan Street South Hadley, MA $303, 837 |
18' Arch culvert demolition and replacement with 10' x 8' precast culvert. Control of existing river flows, water main reconstruction. |
Rt 495 Bridge Rehab Various Location District 3, MA $1,547,875 |
Substructure and joint rehabilitation on various bridges along I-495. |
Depot Street Bridge Reconstruction Over Dwight Canal Chicopee, MA $1,257,458 |
Bridge Demo/Reconstruction. Temporary Vehicular Bridge both over canal. steel - sheeted support of excavation, utilities - temporary and permanent. |
Prospect Street Bridge Reconstruction Over Hop Brook Manchester, CT $920,610 |
Bridge demo/reconstruction over hop brook, temporary pedestrian bridge, control of water, sewer and road reconstruction. |
Route 38 (Main Street) Bridge Replacement Over the Shawsheen River Tewksbury, MA $814,649 |
Bridge Demo/Reconstruction 2 phases over Shawsheen River, temporary pedestrian bridge, pipe pile foundation. |
Cadwell Road Bridge over Southwest Branch of Housatonic River Pittsfield, MA $394,587 |
Bridge demo, box culvert reconstruction in river, control of water, steel sheeting. |
Woodland Road Bridge over Washington Mountain Brook Lee, MA $817,450 |
Bridge construction, excavation, pipe piles, steel cofferdams, control of water, concrete tremie seal, precast box beam bridge, utilities. |
Route 1 Bridge over Route 140 Foxboro, MA $2,400,000 |
Bridge Demo/Reconstruction, piles and lagging, control of water, precast retaining walls. |
Route 1 over Conrail Bridge Construction Foxboro, MA $400,000 |
Bridge Construction, piles and lagging, precast retaining walls, control of water, temporary bridge with access roadway. |
Route 12 Tranmissions Water Mains Groton, CT $913,000 |
Transmission water main with Meter/Valve structure, highway reconstruction. Temporary bridge with access roadway. |
Effluent Line Stony Brook Treatment Plant Norwich, CT $421,353 |
6" force main, rock excavation, clearing, access road construction and roadway reconstruction. |
Windham Avenue Water Line Extension Colchester, CT $61,000 |
8"&12" water mains, clearing, access road construction, state highway pavement, pavement restoration. |
Indian River Flood Relief Project Norwalk, CT $520,000 |
Drainage, Box Culvert, Bridge, Flood Control, Concrete, Cast-In-Place structures. |
Byram Road, Indian Field Road Bridges Over Metro North Greenwich, CT $50,000 |
Water main on bridge over metro North Railroad. |
Water Street Reconstruction Norwalk, CT $500,000 |
Water, Sewer, Drain, Roadway. |
Leadmine Road Bridge Rehabilitation Sturbridge, MA $88,756 |
Bridge deck rehabilitation, bridge rail replacement. |
Bridge Replacement - Graniteville Road/ River Street Over B&M Railroad Westford, MA $886,688 |
Temporary bridge removal and bridge recon, 42" caissons, concrete work, road, utility recon. |